Data Centers | Last Energy
Nuclear-as-a-Service Powering the Evolving Data Center Landscape
In a world driven by data, reliable and scalable energy solutions are paramount to meet evolving energy requirements and sustainability commitments. Last Energy brings carbon-free, baseload power to data centers through long-term, fixed-price power purchase agreements (PPA)—rapidly deploying resilient power at scale through a fully modular power plant and a full-service delivery model.
Get the Information kit Contact us
Flexible
Minimal water and land requirements allow for flexible siting.
Clean
Nuclear is a carbon-free source of energy that can reduce scope 2 emissions.
Reliable
Provides reliable baseload and low-cost energy 24/7, 365 days a year.
Scalable
Delivered in 20 MWe units, the PWR-20 scales to meet energy demand.
Redundant
We offer N+1 and N+2 redundancy to further reduce reliance on the grid.
Rapid
The PWR-20 is assembled on-site in just four months.
Gain a Competitive Advantage with Last Energy’s Solution
Bypass grid supply challenges
Our accelerated 24-month project delivery timeline allows us to meet scalable power capacity needs while boosting grid resilience.
Eliminate upfront capital cost
Procure affordable and consistent electricity, with no up-front cost, through our long-term, fixed-price physical or virtual baseload PPA.
Secure time-matched clean power
Flexible siting options allow for deployment via grid transmission or private wire, solving time-matched scope 2 emissions tracking.
The Only Rapid, Reliable, Clean Solution
Eliminate the risk of a delayed electric interconnection while increasing resilience to grid price volatility. With the PWR-20 as a source for consistent, distributed energy generation, data centers can achieve uptime requirements, ensure redundancy, and minimize the risk of downtime.
Comparison of Energy Solutions for Data Centers
.png)
Learn about our delivery model Explore the proven technology
Case Studies
Customers choose Last Energy for their clean energy futures. From data centers to industrial zones, see how Last Energy powers business better.
Enterprise Data Center
Rapidly Scaling Enterprise Data Center Demand and Accelerating Timelines
An energy solution to maintain high standards of scale, speed-to-market, efficiency, sustainability, and operational excellence without the responsibility of financing and managing an energy project.
32% Cost Savings
Katowice Special Economic Zone
Last Energy agrees to develop 10 of its 20 MWe micro nuclear power plants in KSSE
The special economic zone represents over 90,000 industrial jobs in sectors from automotive to metallurgy, glassware, and plastics.
10 Units
Latest Press
The nuclear option: Why the data centers of the future could run on the power source of the past
The AI boom is straining clean-energy sources, forcing utilities to delay new data centers and keep coal plants running. Many see nuclear power as the solution.
May 28, 2024
When the data center industry comes together, power is on everyone’s mind
Onlookers lined the street outside the Walter E. Washington Convention Center in Washington D.C. last month as Last Energy suspended a 22-ton prototype of its small modular reactor from a crane.
May 24, 2024
Welcome to the Era of the Nuclear-Powered Data Center
By productizing the PWR-20 and right-sizing it to commercial uses like data centers, they can deliver faster, more cost-effectively, and minimize financing and project delivery risk.
May 8, 2024